Jaguar Land Rover surged in popularity during 2012 with its Evoque and Freelander models, so it was decided to increase production at their Liverpool site to a 24 hour production shift, meaning three shifts which meant a 30% increase in the workforce. with the increased foot fall on the production line the Jaguar Land Rover management required a quick slip resistant and anti-fatigue matting system that was quick to install along the entire production line with the minimum amount of downtime.








